Steel prices keep climbing. A 15% deposit locks your quoted price until spring. Get a quote →
Home » Service Area » Metal Buildings in Virginia » Metal Buildings in Rocky Mount, VA

Stoots Storage Solutions

Metal Buildings in Rocky Mount, VA

Rocky Mount is the Franklin County seat, on the eastern side of the area we serve from Galax. We are a family-run metal building and concrete contractor based in Galax, and we handle the site prep, the footers, the slab and the building install ourselves, with one point of contact from the first call to the last screw.

Side view of a black metal shop building with a walk-in door and windows
A black metal shop building with a walk-in door and windows, one of our installs. See our installs

Building in Rocky Mount

Rocky Mount sits where US-220 and VA-40 meet, between Roanoke and Martinsville, with Smith Mountain Lake to the east and Ferrum to the west. The ground is lower and more rolling than our home plateau, with plenty of red clay, so drainage and a well-compacted pad matter on most sites.

Permits in Rocky Mount

  • Franklin County Building Inspections: 1255 Franklin Street, Suite 103, Rocky Mount, VA 24151 · 540-483-3047
  • What we provide: engineered drawings for the permit packet, sized to the local numbers.

Franklin County Building Inspections covers the county plus the Towns of Rocky Mount and Boones Mill, so the county issues your building permit. If your lot is inside town limits, check with the Town of Rocky Mount about zoning too. The county’s design sheet dates from the 2018 code, so we double-check the numbers with the office before we order. Source: Franklin County Building Inspections.

Franklin County exempts detached accessory storage buildings under 256 square feet from a building permit, but an electrical permit is still needed if you wire one. The county also has a farm structure exemption affidavit. Garages, shops and larger carports need a permit.

Call the permit office to confirm what your lot needs. Our guide to metal building permits in Virginia covers the statewide rules, and here is how to check setbacks on your lot.

Concrete and site prep

Before we drive out, we check your property’s slope and drainage on USGS elevation maps. Then we grade the pad so water runs away from the building, pour footers below the frost depth the county requires, at least 18 inches, and a 4-inch slab with the anchors set for your building. See concrete and foundations and slab vs. footers.

What people around Rocky Mount build

Around Rocky Mount

Around Rocky Mount we also work in Boones Mill, Ferrum, Wirtz, the Smith Mountain Lake area and the rest of Franklin County, plus Roanoke and Martinsville.

Paying for it

  • Rent-to-own: 15% down, monthly payments about 25% lower than typical rent-to-own programs, and 90 days same as cash from delivery. Open carports are not eligible. Rent-to-own details
  • Price lock: a 15% deposit locks your quoted building price until spring.
  • Concrete: 10% of the job subtotal at signing, 35% of the remaining balance at the footer pour, 65% at the slab pour.

Common questions

Do you install metal buildings in Rocky Mount?

Yes. We build in Rocky Mount and across Franklin County, and we do the site prep, the concrete and the install.

Do I need a permit for a metal building in Rocky Mount?

Franklin County exempts detached accessory storage buildings under 256 square feet from a building permit, but garages, shops and larger carports need one. In Rocky Mount, start with Franklin County Building Inspections at 540-483-3047, and check town zoning if you are inside town limits.

Will my building meet Rocky Mount’s snow and wind requirements?

Yes. We confirm the snow, wind and frost numbers for your site before we order, and your building comes certified with engineered drawings for the permit.

Can you look at my site before I buy?

Yes. Every job starts with a site review. Send us your address or a few photos, and we check slope, drainage and delivery access before we quote.