Site Grading & Site Prep for Metal Buildings

We grade and prep the site for your metal building, then pour the concrete and set the building ourselves, so the pad is right for the building that goes on it. A steel building is only as straight as the ground under it. Get the grading right and the footers, slab and building all go in straight.

Dark gray steel building on a finished gravel pad
A steel building on a finished gravel pad.

What our site prep includes

  • Walking the site with you, and calling 811 to mark buried utilities before any digging
  • Stripping topsoil and roots so the pad sits on solid ground
  • Cutting high spots and filling low ones to a level pad
  • Compacting fill in layers so it does not settle later
  • Shaping drainage so water runs away from the building
  • Building the pad bigger than the building
  • Gravel pads for carports and buildings that can sit on gravel

Then the concrete, from the same crew

Once the pad is ready, we pour the footers or slab to your county’s frost depth, with the anchor points set for the building going on top. One company does the dirt, the concrete and the building, so there is nobody to point fingers at but us. See our concrete foundations page.

Slab prep: compacted gravel base, wood forms and vapor barrier being rolled out before the pour
Slab prep: compacted gravel base, wood forms and vapor barrier being rolled out before the pour.

Read before you start

Common questions

Do I need grading before a metal building?

Almost always. The building needs a flat, solid pad that sheds water. Grading strips topsoil, cuts high spots, fills low ones, compacts the fill in layers and slopes the ground away from the building before any gravel or concrete goes down.

How far should the ground slope away from the building?

Virginia’s code wants the ground to fall at least 6 inches in the first 10 feet out from the foundation. We grade so rain runs away from the slab instead of sitting against the steel.

Should the pad be bigger than the building?

Yes. A pad that extends past the building gives room for the crew to work, keeps the edges solid and gives water somewhere to go.

Can you grade for a gravel pad instead of concrete?

Yes. Carports and some buildings can sit on a compacted gravel pad. Garages and shops usually go on a concrete slab or footers. We can tell you which fits your building and county.

Serving Galax, Carroll and Grayson counties and across Southwest Virginia and North Carolina. Call or text 276-235-1191, or build and price your building.