Home » Buying & Installation » What “Turnkey” Really Means for a Metal Building

What “Turnkey” Really Means for a Metal Building

Steel building frame erected on a prepared site

Written by

in

· Updated

A lot of companies say “turnkey.” What it should mean is simple: one company takes your project from bare ground to a finished building, and you have one point of contact the whole way. Here is what that looks like with us.

Turnkey starts with the foundation. See our concrete foundations page for the slabs and footers we pour.

Long dark gray steel building under construction on a graded pad
A steel building going up on a graded pad.

The usual way, and why it goes wrong

In the typical setup, you buy the building from a dealer, hire a concrete company yourself, and hope the manufacturer’s install crew shows up when the slab is ready. If the anchors are off or the pad is out of square, everyone points at someone else, and you are stuck in the middle.

What turnkey covers with us

  • Site review and quote: we look at the spot, talk through size, use and roof style, and give you one quote.
  • Site prep: getting the ground ready for the foundation.
  • Footers and slab: poured by us, to your building’s exact layout and your county’s requirements.
  • Building install: delivered, set, anchored to the foundation, and checked before we leave.

Why it is better for you

  • One phone number: if something needs fixing, you call us, period.
  • The concrete fits the building: the people pouring the slab know exactly where the anchors go.
  • Better scheduling: no waiting on three companies to line up.
  • Fewer surprises: the quote covers the whole job.

Who builds the buildings

We work with a small group of four manufacturers, after cutting ties with 53 others over quality and how they treated customers. That lets us stand behind what we install.

How a turnkey job runs with us, step by step

  1. Site review and written quote. Send a few photos of the spot. We check the property’s slope and drainage on USGS elevation maps before we drive out, then look at access, utilities and what your county requires. You get one written quote with the building, site prep and concrete on separate lines.
  2. Deposit and price lock. Concrete work starts with 10% of the job subtotal at signing. If you want to hold today’s building price, a 15% deposit locks it until spring.
  3. Drawings and permits. We supply the engineered drawings your building office asks for, sized to your county’s wind and snow numbers and frost depth.
  4. Call 811. Underground utilities get marked before anyone digs. In Virginia that is free through Virginia 811.
  5. Site prep. Clear, cut, fill, compact and grade so the pad drains away from the building and sits level.
  6. Footers. Poured below your local frost line, with the anchor layout taken from the building’s drawings. 35% of the remaining concrete balance is due at the footer pour.
  7. Slab. A 4-inch slab is standard for most garages and shops, with control joints cut so cracks happen where we want them. The last 65% of the concrete balance is due at the slab pour.
  8. Cure time. Concrete keeps gaining strength for weeks after the pour. We schedule the building around the concrete, not the other way around.
  9. Delivery and install. The building is delivered, set on the slab, anchored and checked before we leave.
  10. Walkthrough. You see the finished building with us, doors and all, and you have one number to call if anything needs attention.

Turnkey vs. building-only vs. “manufacturer direct”

Turnkey with usBuilding-only dealerManufacturer direct
Site prepIncluded in the quoteYou hire it outYou hire it out
Footers and slabPoured by our crewsYou hire a concrete companyYou hire a concrete company
Anchor layout matches the buildingSame company does bothUp to you and two crewsUp to you and two crews
SchedulingOne scheduleTwo or three schedulesTwo or three schedules
Who you call with a problemUsDepends who caused itDepends who caused it

“Manufacturer direct” sounds like it cuts out the middleman, but the manufacturer does not grade your site or pour your concrete. Someone still has to, and when the anchors and the slab do not line up, nobody owns the problem.

Questions to ask any company that says “turnkey”

  • Do your own crews pour the concrete, or is it subbed out?
  • Who is responsible if the anchors do not line up with the building?
  • Who supplies the engineered drawings for my permit?
  • What exactly is in the price: grading, gravel, footers, slab, anchors, delivery, install, cleanup?
  • How is payment split, and what work has to be done before each payment?
  • What happens to the schedule if weather or an inspection pushes things back?

If the answers are vague, the quote probably is too. Our quote comparison checklist lays out every line to check.

When turnkey is not the right fit

  • You already have a good slab. If it is level, big enough, thick enough and works with the building’s anchor drawings, you may only need the building. We will look at it before we sell you anything.
  • Simple farm or open carport jobs. Some open carports and ag buildings go on gravel or dirt with ground anchors, and do not need concrete at all.

Is turnkey right for you?

If you already have a finished, level pad poured to the right specs, you may only need the building. But for most people starting from bare ground, turnkey is the simplest and safest way to get it done. Browse our recent installs to see the results.

Want one company for the site prep, the concrete and the building? Call or text 276-235-1191, or send us a quote request, or see our concrete foundations.

Ready to price your own? Build & Price Your Building

Common questions

Is turnkey more expensive?

Compare the whole job, not the building line. A building-only price looks lower until you add the site prep, the concrete, the anchors and the time it takes to line up separate crews. Put the totals side by side.

How long does a turnkey job take?

It depends on permits, weather and the manufacturer’s lead time. The concrete also needs time to cure before the building goes on it. Our order-to-install timeline walks through each stage.

Do I need to be home on install day?

It helps to be there at the start and for the walkthrough at the end. See what to expect on install day.